Spray Dryer Chamber & Boiler-Dryer
Unit for Samson Distillery

Home
Services

Davanagere, Karnataka

Designed and installed a 14m diameter × 32m high spray dryer chamber along with a 300 MT capacity boiler-dryer unit at Samson Distillery, Davanagere, Karnataka. The system efficiently processes spentwash, improving operational efficiency and minimizing environmental impact.

Year

2025 - On-going Project

industry

Distillery & Alcohol Production

cost efficiency

Optimized design reduced energy consumption and operational costs for the client.

Project Overview

Metalic successfully executed the engineering, fabrication, and installation of a Spray Dryer Chamber measuring 14 meters in diameter and 32 meters in height at Samson Distillery, Davanagere, Karnataka. The project included a boiler-dryer unit with a capacity of 300 metric tons of spentwash, designed to efficiently process the distillery’s waste into a stable, manageable form while minimizing environmental impact. Our team ensured precise integration with the client’s existing operations, implementing high-quality materials and advanced engineering techniques to deliver a robust, long-lasting system. The project was completed with minimal downtime, meeting strict safety standards and operational requirements, while providing the client with a scalable solution for future production growth.

Other Projects

IND 035

Belgaum, Karnataka

Metalic fabricated and erected a 34m diameter × 13m high molasses storage tank with a 15,000 MT capacity at ICPL Sugar Plant, Alagawadi, Belgaum, Karnataka, enhancing storage efficiency and supporting uninterrupted production.

Year
2025 - On-going Project
industry
Sugar & Distillery​
cost efficiency
Efficient design reduced material usage and overall project costs.
IND 036​

Solapur, Maharashtra

Fabrication and erection of a 15,000 MT molasses storage tank measuring 40m in diameter and 10.5m in height at Lokmangal Agro Distillery Pvt. Ltd.

Year
2023
industry
Sugar & Distillery​
cost efficiency
Adoption of the Jack System reduced construction time and labor costs